background image

 

Page 10

 

© 2021 ABB. All rights reserved.

 

 

 

QUICK START GUIDE

 

Notes

 

Summary of Contents for Power Express RRH

Page 1: ...he shelf Capacitivejumper required at each load Tools required Jl 1111 11111 1 111111111111111 JIIIIIIIIIIIIII Cabla crimpers Sockets 5 16 7 16 and1 2 Torquewrench 0 240in lb 28 Nm Wirecutters and strippers Screw Drivers Flat 2 Phtlllps Step 1 Mount Shelf Ensuretheframe rackis properlybounded Attachthesystemtotheframe rackusinga minimum of4 twoon eachside 12 24screws provided Torqueto35 in lb 5 1 ...

Page 2: ...A ModuleB ModufeC Ir lr 1 Ir Ir Ir OIi r Ir Ir II I II I II I II I 1 1 1 I II I II I Circuit 1 CmiltZ Cln ult3 Circuit1 Circuitz Orailt S Circuit1 OrailtZ Step 4 Verify DC Input Voltage and Polarity Step 5 Connect DC Outputs Wlre 6AWGor8AWG Lug single Connectout eachmodu hole 10 notprovided and out w1res to each circuit of le Connect out wtre before out wtre Connections Connections ModuleA ModuleB...

Page 3: ... cable InsertalarmconnectorInto the chassis ___ Open OnAlarm 00A Common COM CloseOnAlarm COA Wireentry28 16gauge MajorAlarm Minor Warning Shock Hazard and Equipment Damage Equipment and subassembly ports aresuitableforconnectiontointra buildingorunexposedwiringor cabling can be connected to shielded intra building cabling grounded atboth ends Step 7 Verify Shelf ID Setting Down is 0 ShelfID O oper...

Page 4: ...eaker after action applied Circuit Shutdown Clear external fault Toggle DC Input breaker Jl 1111 11111 1 Information Module Status LEDs Module OKLED G G 4 YBLINK 2 RBLINK 1 R y 3 y 3 1 R Circuit LEDr 1 3 G OFF YBLINK RBLINK R Module Status LEDs CiraJit ON normal Circuit No InputVoltage Apply DC Input remains replace module Circuit Internal Fault Replace module Y CircuitStandby remote 3 Turn circui...

Page 5: ...the Power Express RRH Ordering Guide available at abbpowerconversion com Grounding Bonding Network Connect to an Isolated Ground Plane Isolated Bonding Network or an Integrated Ground Plane Mesh Bonding Network or Common Bonding Network Installation Environment Install in Network Telecommunication Facilities OSP or where NEC applies These documents are available at abbpowerconversion com Document ...

Page 6: ...nt ratings to assure current does not exceed Continuous Load List 1 60 of protector rating Maximum Load List 2 typically end of discharge 80 of protector rating Field wired Conductors Follow all National Electric Code NEC and local rules and regulations Insulation rating 90 C minimum 105 C minimum if internal to enclosed equipment cabinets Size AC field wired conductors with 75 C ampacity NEC equa...

Page 7: ...equipped with ringer modules hazardous voltages will be present on the ringer output connectors Use the following precautions in addition to proper job training and safety procedures Use only properly insulated tools Remove all metallic objects key chains glasses rings watches or other jewelry Follow Lock Out Tag Out LOTO procedures customer specified site specific or general as appropriate Discon...

Page 8: ...Page 8 2021 ABB All rights reserved QUICK START GUIDE Notes ...

Page 9: ...Page 9 2021 ABB All rights reserved QUICK START GUIDE Notes ...

Page 10: ...Page 10 2021 ABB All rights reserved QUICK START GUIDE Notes ...

Page 11: ...eed particulars shall prevail ABB AG does not accept any responsibility whatsoever for potential errors or possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB...

Reviews: