Operation Manual / Power2 550-M / High-pressure stage
2 Safety / 2.13 Safe operation
© Copyright 2022 ABB. All rights reserved.
HZTL4058_EN
Rev.F
March 2022
2.13
Safe operation
Mechanical hazards during operation
During standard operation, no mechanical hazards are caused by the low-pressure and high-
pressure stage, provided that it has been properly installed.
Low-pressure and high-pressure stages are not designed for sudden pressure loss that may
occur due to the piping system between the compressor or the turbine stages bursting.
Safety during commissioning and operation
u
Visually inspect your working environment before starting work.
u
Remove any obstacles and objects littering the workplace.
u
Check all pipes to and from the Power2 for damage and leaks before commissioning.
u
Check Power2 for recognisable damage or defects every 12 hours of operation or at least
once a day.
u
Report any damage and any alterations of operational characteristics to the responsible
department immediately.
u
In case of damage, take the Power2 out of operation immediately and safeguard against
accidental/unauthorised use.
u
When switching on operating energy supplies (hydraulics, pneumatics, electricity), pay at-
tention to the risks that may occur as a consequence of this energy input.