Operation Manual / Power2 845-M / Low-pressure stage
9 Disassembly and assembly / 9.9 Removing the cartridge group
© Copyright 2022 ABB. All rights reserved.
HZTL4068_EN
Rev.E
March 2022
Fig. 33: Moving out cartridge group 2
7. Carefully move out cartridge group.
8. Put cartridge group into the fixtures in the turned-over toolbox cover.
9. Remove plate (90032), screw (90656), nut (90432) and plates (90031).
10. Remove the press-off screws (90920).
11. Remove O-rings (42017 / 42018).
Putting down cartridge group onto cover
CAUTION
Damage to cartridge group and toolbox cover
The turned-over toolbox cover may only be used for intermediate storage of
the cartridge group.
u
The cover must be on a level surface.
u
The cover may not be used to transport the cartridge group.
Fig. 34: Putting down cartridge group onto cover
Page
81
/
119