Operation Manual / Power2 850-M / 4.1 Low-pressure stage
4
Disassembly and assembly
Page 27 / 49
© Copyright 2015 ABB. All rights reserved.
HZTL4062_EN
Revision -
December 2015
Figure 23: Inserting the cartridge group
Part number
Thread and tightening torque
42087
M12
80 Nm
Table 9: Tightening torque (42087)
1. Screw in a guide stud (90321) in the upper area on the left and right.
2. Insert cartridge group via the guide stud.
3. Coat a screw (42087) with high-temperature grease and screw in to secure the cartridge
group.
4. Remove plates (90031) and brackets (90030).
5. Remove the guide stud (90321).
6. Coat thread of remaining screws (42087) with high-temperature grease, fit screws and
tighten all screws.
7. Fit a new O-ring (42012).
Summary of Contents for Power2 850-M16
Page 28: ......
Page 32: ......
Page 42: ......
Page 44: ......
Page 70: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......
Page 100: ......
Page 130: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 178: ......