Operation Manual / Power2 850-M / 4.1 Low-pressure stage
5
Taking out of operation at short notice
Page 40 / 49
© Copyright 2015 ABB. All rights reserved.
HZTL4062_EN
Revision -
December 2015
5.1.1
Manufacturing the cover plate
The cover plate and the other parts that are required are not included in the scope of delivery of
ABB Turbo Systems and must be manufactured in accordance with the drawing (see Figure
by the operator.
Required parts
1 cover plate (01) (recommended material: 1.4541 / 1.4571)
1 gasket (02) (temperature resistant up to 550 °C)
8 additional screws (03) to the screws (42087) from the scope of delivery
15 sleeves (04)
Figure 32: Cover plate / gasket, sleeves and screws
Cover plate (gasket), sleeves and screws, dimensions [mm]
Ø1
Ø2
Ø3
Ø4
Ø5
B1
B2
658
600
14
14
20
10
32
Table 18: Cover plate / gasket
Summary of Contents for Power2 850-M16
Page 28: ......
Page 32: ......
Page 42: ......
Page 44: ......
Page 70: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......
Page 100: ......
Page 130: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 178: ......