Operation Manual / Power2 850-M / 4.2 High-pressure stage
4 Disassembly and assembly / 4.10 Installing the cartridge group
© Copyright 2017 ABB. All rights reserved.
HZTL4063_EN
Revision A
August 2017
Fig. 17: Installing the cartridge group 2
Part number
Thread and tightening torque
42099
M12x80
80 Nm
Table 8: Tightening torque (42099)
5. Fit a screw (42099) as a safeguard.
6. Remove screw (90656), nut (90415) and plates (90031).
7. Remove screws (90900) and bracket (90030).
8. Fit screws (42099). Observe the tightening torque.
9. Fit a new O-ring (42010).
Page
21
/
35
Summary of Contents for Power2 850-M16
Page 28: ......
Page 32: ......
Page 42: ......
Page 44: ......
Page 70: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......
Page 100: ......
Page 130: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 178: ......