Operation Manual / Power2 / 1 Introduction
1 Introduction / 1.4 Power2 layout and function
© Copyright 2017 ABB. All rights reserved.
HZTL4004_EN
Revision D
June 2017
1.4
Power2 layout and function
Fig. 1: Power2 layout and function
Power2
Two-stage turbocharging
21
HP compressor
Power2 LP
Low-pressure stage
22
HP turbine
Power2 HP High-pressure stage
24
LP turbine
A
Exhaust gas inlet from internal combus-
tion engine
25
LP compressor
B
Exhaust gas outlet
26
Intercooler
C
Air or air/gas mixture inlet
D
Air or air/gas mixture outlet and supply
to the charge air cooler
- - -
Not included in the ABB Turbo Sys-
tems scope of delivery
The diagram shows the position of the low-pressure (Power2 LP) and high-pressure stage
(Power2 HP) within two-stage turbocharging (Power2). The low-pressure stage is always op-
erated in combination with a high-pressure stage connected in series. The two-stage tur-
bocharging (Power2) supplies the engine with the air volume and associated charging pres-
sure required for operation.
Here, the exhaust gases of the internal combustion engine flow through the turbine (22) of
the high-pressure stage and then to the turbine (24) of the low-pressure stage. The com-
pressor (25) of the low-pressure stage sucks in fresh air or the air/gas mixture, respectively.
This precompressed air or air/gas mixture flows through the intercooler (26) into the com-
pressor (21) of the high-pressure stage. Here the air or air/gas mixture is compressed fur-
ther and leaves the two-stage turbocharging (Power2) in the direction of the charge air
cooler.
Page
5
/
8
Summary of Contents for Power2 850-M16
Page 28: ......
Page 32: ......
Page 42: ......
Page 44: ......
Page 70: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......
Page 100: ......
Page 130: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 178: ......