Operation Manual / Power2 850-M / 4.2 High-pressure stage
2 Removal and installation / 2.2 Removing the high-pressure stage
© Copyright 2017 ABB. All rights reserved.
HZTL4063_EN
Revision A
August 2017
2.2
Removing the high-pressure stage
CAUTION
Tilting of high-pressure stage and leaks at bellows
The high-pressure stage must not be transported or put down with the air
suction branch and the bellows fitted.
u
The air suction branch / bellows combination must be removed, trans-
ported and put down separately.
Fig. 1: Suspension of complete high-pressure stage
u
Remove insulation.
u
Disconnect all gas, air, water and oil pipes in accordance with the enginebuilder's instruc-
tions.
u
Unplug the cable connector at the speed sensor.
u
Remove air suction branch together with bellows
(see Fig. 4: Removing the air suction
.
u
Check lifting gear.
u
Attach one lifting gear to the two suspension points of the bearing casing and one lifting
gear to the support.
u
Undo fixing screws at foot and support.
u
Lift the high-pressure stage from the engine and put it down.
u
Cover the oil connection.
Page
4
/
35
Summary of Contents for Power2 850-M16
Page 28: ......
Page 32: ......
Page 42: ......
Page 44: ......
Page 70: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......
Page 100: ......
Page 130: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 178: ......