Operation Manual / Power2 850-M / 4.2 High-pressure stage
4 Disassembly and assembly / 4.1 Introduction
© Copyright 2017 ABB. All rights reserved.
HZTL4063_EN
Revision A
August 2017
4
Disassembly and assembly
4.1
Introduction
CAUTION
Further operations
This Operation Manual may be used to carry out only those operations that
are described in it. Further operations that are executed in an incorrect way
can lead to serious damage to the machine.
u
ABB Turbo Systems recommends having further operations carried out
only by trained personnel from an ABB Turbocharging Service Station.
u
Mark the casing position for assembly.
Identification of the assembly devices
Not all assembly devices are marked with a part number. Identification is guaranteed by the
tool list. This list is enclosed with the toolbox.
WARNING
Servicing the assembly devices
Assembly devices must be checked for damage before and after use.
u
Visually inspect for corrosion, cracks, deformation and wear.
u
Damaged assembly devices must no longer be used and must be re-
placed.
Customer spare part set
Before starting operations, make sure the required customer spare part set is available (see
chapter
).
Tightening torques for components
The specified tightening torques of the screw fittings must be observed
.
Tightening torques for assembly devices
Unless described otherwise, the screws and nuts of the assembly devices supplied by ABB
must be tightened so they rest firmly against the surface.
Definition of terms
¡
Suspension point
Defined loading point on a component or an assembly (blind hole thread, eyelet, lug).
Page
8
/
35
Summary of Contents for Power2 850-M16
Page 28: ......
Page 32: ......
Page 42: ......
Page 44: ......
Page 70: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......
Page 100: ......
Page 130: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 178: ......