Operation Manual / Power2 850-M / 4.2 High-pressure stage
4 Disassembly and assembly / 4.10 Installing the cartridge group
© Copyright 2017 ABB. All rights reserved.
HZTL4063_EN
Revision A
August 2017
4.10
Installing the cartridge group
Fig. 15: Installing O-rings
u
Fit new O-rings (42017 / 42018).
Fig. 16: Installing the cartridge group 1
1. Clean slots for lamellar rings (64001) and fit new lamellar rings. Arrange joints so that
they are offset by 180°.
2. Fit bracket (90030) and plates (90031) (Bracket assembly
3. Fit lifting gear to swivel lifting eye (90657).
4. Lift cartridge group and carefully move in.
Page
20
/
35
Summary of Contents for Power2 850-M16
Page 28: ......
Page 32: ......
Page 42: ......
Page 44: ......
Page 70: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......
Page 100: ......
Page 130: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 178: ......