9
—
3 Installation
3 I N S TA L L AT I O N
3 .1 .1 Receipt of the UPS and visual inspection
When receiving the UPS, carefully examine the
packing container and the UPS for any signs of
physical damage. In case of damage, notify the
carrier immediately.
The packing container of the UPS protects it from
mechanical and environmental damage. To increase
protection, the UPS is wrapped in a plastic sheet.
Keep the packaging for later re-use.
3 .1 .2 Unpacking list
After examining the package, open the box and
check the following items are included:
• 1 x PowerValue 11 T G2 UPS
• 1 x user manual
• 2 x UPS stands (support)
(only for 6 kVA B/B2 & 10 kVA B/B2)
• 4 x M4 round screw (UPS stands)
• EPO contactor
• Dry contactor
• 1 x IEC C13-C14 cable
• 1 x monitoring software CD
• 1 x 15-pin communication cable
(for parallel systems)
• RS232 cable
• 1 x USB cable
Examine the UPS for any signs of damage and
ensure that the received UPS corresponds to the
material indicated in the delivery note. Notify
your carrier or supplier immediately in case of
any damage.
3 .1 .3 Storage of UPS
If you plan to store the UPS prior to use, keep it
in a dry, clean and cool storage room with an
ambient temperature between -15 °C to +60°C
and humidity of less than 95 percent (non-
condensing). If the packing container has been
removed, protect the UPS from dust. Always keep
the UPS in an upright position and do not drop.
—
3 .1 Delivery, transportation, positioning and storage
Summary of Contents for PowerValue 11 T G2 10 kVA B
Page 41: ...41 APPENDIX B ...