Modifications reserved
Page 43/50
•
mains is present.
The battery testing can be carried out independently of the operation mode (OFF-LINE or ON-LINE) and
whether or not the load is connected. The battery test procedure can be performed from the UPS
display, in the service setup mode.
7.4
Battery maintenance, disposal and recycling
The battery maintenance shall be done by a certified Service Partner.
To ensure an optimum operation of the UPS system and a continuous and efficient protection of the
connected load it is recommended to check the batteries every 12 months.
Batteries contain dangerous substances that will harm the environment if thrown away. If you change
the batteries yourself, contact qualified organizations for battery disposal and recycling.
Summary of Contents for PowerWave 33 Series 3
Page 1: ... Copyright 2017 ABB All rights reserved User Manual PowerWave 33 Series 3 60 120 kW ...
Page 46: ...Modifications reserved Page 46 50 10 Attachments 10 1 Technical data sheet ...
Page 48: ......
Page 49: ... Copyright 2016 ABB All rights reserved Technical data sheet PowerWave 33 Serie 3 60 120 kW ...