172 Operating instructions
Manual Power Quality Filter PQFS
Operation as
programmed
Close MC,
start fans
Start IGBTs and
3, 4- wire
connectivity
check
Network
identification
Start-up sequence
Open MC
Stop filter
DC capacitors
preload check
Start filter
Controllers
running,
DC
capacitors
charging
Apply power to filter
auxiliaries
Figure 84: Filter operation sequence when no fault is present
The DC bus also incorporates discharge resistors that can discharge the DC bus in 25
minutes.
9.3
Modifying the user requirements
Providing that the filter locks have not been engaged, the user can change the customer
settings to better suit his needs. These settings can be accessed in the PQF-Manager
menu [/Welcome/Settings/Customer set.].
The user requirements can be divided into the following categories:
−
Setting up the filter mode, the harmonic requirements and the reactive power
requirements. Refer to
Section 7.9.1.1
for detailed information on these topics.
−
Setting up alarms, warnings and digital I/O. The digital I/O allows configuration of
the filter to operate in remote control mode etc. Refer to
Section 7.9.1.4
for detailed
information on these topics.
Advanced user requirements have to be set up in the ‘installation settings’ menu
([/Welcome/Settings/Installation set.]). These advanced functions include:
−
The autorestart function (after power outage).
−
The standby function to switch off the IGBTs when the load requirement is low.