Operation Manual / Power2 340-H / Low-pressure stage
9 Disassembly and assembly / 9.18 Installing the air inlets
© Copyright 2022 ABB. All rights reserved.
HZTL4053_EN
Rev.F
March 2022
9.18
Installing the air inlets
Fig. 41: Installing the air inlets
Product
Size
Tightening torque [Nm]
Power2 340-H LP
M12
60
Table 49: Tightening torque (72020)
1. Secure lifting gear to filter silencer (81000).
2. Fit a new O-ring (81010) to the filter silencer (81000) or a new O-ring (82010) to the air
suction branch (82000).
3. Fit the filter silencer (81000) or air suction branch (82000) with the V-clamp (72020).
4. Observe tightening torque.
Page
88
/
122
Summary of Contents for PT003924
Page 2: ......