Operation Manual / Power2 550-M / High-pressure stage
6 Operation and service / 6.2 Service work
© Copyright 2022 ABB. All rights reserved.
HZTL4058_EN
Rev.F
March 2022
6.2.4
Service work every 12000 ... 15000 operating hours
The rotor and bearing parts must be checked and assessed by a Turbo Systems service sta-
tion.
u
Remove low-pressure and high-pressure stage from the engine and dismantle according
to chapter Disassembly and assembly. Measure clearances.
u
Clean nozzle ring and casing and check for cracks and erosion/corrosion.
Additional measures in conjunction with the high-pressure stage:
u
Replace gaskets every time after disassembly.
u
Check bellows between air-inlet casing and compressor casing for cracks and clean (see
also chapter
Cleaning the high-pressure stage bellows (if present)
6.2.5
Service work according to specifications on the rating
plate
The following work must be carried out by a Turbo Systems service station:
¡
Replacement of the bearing parts
¡
Replacement of the turbine and the compressor.
6.2.6
Entries in the engine logbook
The monitoring of the engine enables conclusions to be drawn on the behaviour of the low-
pressure and high-pressure stage.
The following operating data and measured values must be entered regularly in the engine
logbook of the enginebuilder:
¡
Performance and speed of the engine
¡
Air intake temperature
¡
Pressure of the charge air
¡
Pressure loss in the charge air cooler and intercooler
¡
Lubricating oil pressure and lubricating oil temperature
If present:
¡
Speed of low-pressure and high-pressure stage
¡
Air temperature before and after the compressor and after the charge air cooler
¡
Exhaust gas temperature before and after the turbine
¡
Atmospheric humidity of the suction air (before the low-pressure stage)
Page
53
/
119