Operation Manual / Power2 845-M / High-pressure stage
9 Disassembly and assembly / 9.11 Installing the cartridge group
© Copyright 2022 ABB. All rights reserved.
HZTL4069_EN
Rev.F
March 2022
Fig. 36: Installing the cartridge group 2
Part number
Thread and tightening torque
42099
M12x70
80 Nm
Table 43: Tightening torque (42099)
5. Fit a screw (42099) as a safeguard.
6. Remove screw (90656), nut (90415) and plate (90031).
7. Remove screws (90900) and bracket (90030).
8. Fit screws (42099). Observe tightening torque.
9. Fit a new O-ring (42010).
Page
79
/
104
Summary of Contents for PT004116
Page 2: ......