Contents
Using LON rear port ................................................................ 69
Downloading the configuration and setting files ........................... 69
Chapter 10 Requirement of trig condition for disturbance report
71
Requirement of trig condition for disturbance report.......................... 72
Chapter 11 Establishing connection and verifying the
SPA/IEC-communication .............................................. 73
Entering settings ................................................................................ 74
Entering SPA settings................................................................... 74
Entering IEC settings .................................................................... 74
Verifying the communication.............................................................. 76
Verifying SPA communication ...................................................... 76
Verifying IEC communication........................................................ 76
Optical budget calculation for serial communication with SPA/IEC . 77
Chapter 12 Establishing connection and verifying the LON com-
munication ..................................................................... 79
Reference .......................................................................................... 80
Verification of the optical budget .................................................. 80
Optical budget calculation for serial communication with LON 80
Chapter 13 Verifying settings by secondary injection ................. 81
Overview............................................................................................ 82
Preparing for test ............................................................................... 84
Overview....................................................................................... 84
Preparing the connection to the test equipment ........................... 84
Setting the terminal in test mode .................................................. 85
Connecting test equipment to the terminal ................................... 85
Verifying the connection and the analog inputs ............................ 86
Releasing the function(s) to be tested .......................................... 87
Checking the disturbance report settings ..................................... 87
Identifying the function to test in
the technical reference manual
............................................ 88
Autorecloser (AR) .............................................................................. 89
Preparing ...................................................................................... 90
Checking the AR functionality....................................................... 91
Checking the reclosing condition .................................................. 91
Checking the Inhibit signal....................................................... 91
Checking the closing onto a fault............................................. 92
Checking the breaker not ready .............................................. 92
Summary of Contents for REB 551-C3*2.5
Page 9: ...Contents ...
Page 21: ...12 Introduction to the installation and commissioning manual Chapter 1 Introduction ...
Page 27: ...18 Note signs Chapter 2 Safety information ...
Page 53: ...44 Installing the 56 64 kbit data communication cables Chapter 5 Installing the terminal ...
Page 59: ...50 Checking the binary I O circuits Chapter 6 Checking the external circuitry ...
Page 147: ...138 Repair support Chapter 16 Fault tracing and repair ...