EnaAcc
:
Off
/
On
is used to switch the accumulation of energy on and off.
tEnergy
: Time interval when energy is measured.
tEnergyOnPls
: gives the pulse length ON time of the pulse. It should be at least
100
ms when connected to the Pulse counter function block. Typical value can be
100
ms.
tEnergyOffPls
: gives the OFF time between pulses. Typical value can be
100
ms.
EAFAccPlsQty
and
EARAccPlsQty
: gives the MWh value in each pulse. It should
be selected together with the setting of the Pulse counter (PCGGIO) settings to
give the correct total pulse value.
ERFAccPlsQty
and
ERVAccPlsQty
: gives the MVArh value in each pulse. It should
be selected together with the setting of the Pulse counter (PCGGIO) settings to
give the correct total pulse value.
For the advanced user there are a number of settings for direction, zero clamping,
max limit, and so on. Normally, the default values are suitable for these parameters.
Section 13
1MRK 505 388-UEN B
Metering
230
Busbar protection REB650 2.2 IEC
Application manual
Summary of Contents for REB650
Page 1: ...RELION 650 SERIES Busbar protection REB650 Version 2 2 Application manual...
Page 2: ......
Page 18: ...12...
Page 28: ...22...
Page 38: ...32...
Page 78: ...72...
Page 96: ...90...
Page 136: ...130...
Page 150: ...144...
Page 156: ...150...
Page 232: ...226...
Page 278: ...272...
Page 298: ...292...
Page 310: ...304...
Page 320: ...314...
Page 321: ...315...