Completing the test.............................................................. 150
Instantaneous residual overcurrent protection EFPIOC ...........150
Four step residual overcurrent protection, (Zero sequence or
negative sequence directionality) EF4PTOC ............................151
Four step directional earth fault protection........................... 151
Four step non-directional earth fault protection....................152
Completing the test.............................................................. 152
Four step negative sequence overcurrent protection
NS4PTOC .................................................................................152
Completing the test.............................................................. 153
Sensitive directional residual overcurrent and power
protection SDEPSDE ................................................................153
Measuring the operate and time limit for set values.............154
Completing the test.............................................................. 159
Thermal overload protection, two time constants TRPTTR ......159
Checking operate and reset values......................................159
Completing the test.............................................................. 160
Breaker failure protection, phase segregated activation and
output CCRBRF.........................................................................160
Checking the phase current operate value,
Checking the residual (earth fault) current operate value
IN> set below IP>................................................................. 161
Checking the re-trip and back-up times................................161
Verifying the re-trip mode..................................................... 161
Verifying the back-up trip mode............................................162
Verifying instantaneous back-up trip at CB faulty condition. 163
Verifying the case
RetripMode = Contact.............................163
Current&Contact...................... 164
Completing the test.............................................................. 164
Pole discordance protection CCPDSC......................................164
Directional underpower protection GUPPDUP .........................166
Verifying the settings............................................................ 166
Completing the test.............................................................. 167
Directional overpower protection GOPPDOP ...........................167
Verifying the settings............................................................ 167
Completing the test.............................................................. 168
Negative-sequence time overcurrent protection for machines
NS2PTOC .................................................................................168
Verifying settings by secondary injection............................. 168
Completing the test.............................................................. 170
Table of contents
Generator protection REG670 2.0 IEC
5
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...