Figure 49:
Connection of the test set to the IED for test of alarm levels, trip
levels and trip timer
where:
1
is three-phase voltage group1 (U1)
2
is three-phase voltage group2 (U2)
2.
Apply 1.2 · Ur (rated voltage) to the U1 and U2 inputs.
3.
Decrease slowly the voltage of in phase UL1 of the test set until the ALARM
signal is activated.
The ALARM signal is delayed with timer
tAlarm
4.
Check the alarm operation level by comparing the differential voltage level at
ALARM with the set alarm level
UDAlarm
.
5.
Continue to slowly decrease the voltage until START signal is activated.
6.
Check the differential voltage operation level by comparing the differential
voltage level at START with the set trip level
UDTrip
.
7.
to
Observe that the connections to U1 must be shifted to test another phase. (UL1
to UL2, UL2 to UL3, UL3 to UL1)
12.6.5.3
Check of trip and trip reset timers
Procdure
Section 12
1MRK502053-UEN B
Testing functionality by secondary injection
184
Generator protection REG670 2.0 IEC
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...