3
N
DU
U
Beta
=
EQUATION2072 V2 EN
(Equation 102)
considering stated accuracy (
beta
is a setting parameter)
4.
Increase the voltage U
3N
so that the sart signal falls. After that, switch the voltage
U
3N
to zero and measure the time delay for the activation of the signals TRIP and
TRIP3H.
The 100% stator earth fault protection also has a fundamental frequency neutral
point overvoltage function (95% stator earth fault protection). This part of the
protection can be tested separately by means of fundamental frequency voltage
injection from a test equipment.
12.6.6.2
Verifying settings
1.
With the generator rotating at rated speed but not connected: check the value of
the following analogue signals: E3 (the magnitude of the 3
rd
harmonic induced
voltage in the stator), U
3N
(the magnitude of the third-harmonic voltage
measured at the neutral side of the generator), U
3T
(the magnitude of the third-
harmonic voltage measured at the terminal side of the generator) and ANGLE
(the angle between the third-harmonic voltage phasors U
3N
and U
3T
). The value
of E3 should be close to the following value:
(
) (
)
2
2
3 N
3T
3T
E3
U
U
cos(ANGLE)
U
sin(ANGLE)
=
-
×
+
×
EQUATION2076 V1 EN
(Equation 103)
Make sure that ANGLE has a value bigger than 125°
2.
Read the value of DU (differential voltage). The value of DU should be close to
the following value:
(
) (
)
2
2
3N
3T
3T
DU
U
U
cos(ANGLE)
U
sin(ANGLE)
=
+
×
+
×
EQUATION2078 V1 EN
(Equation 104)
3.
Read the value of BU (bias voltage:
Beta
·U
3N
). The ratio DU/BU should be well
below 1 for a non-faulted generator.
4.
After synchronization of the generator the ratio DU/BU is checked for different
load levels of the generator. These different monitoring of load levels should be
the base for the setting of
beta
.
If the function is used with the option of neutral point measurement only the test
is performed by check of this voltage. The operate value should be above the
measured residual third-harmonic voltage in the neutral point at normal
operation (non-faulted generator).
1MRK502053-UEN B
Section 12
Testing functionality by secondary injection
Generator protection REG670 2.0 IEC
187
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...