12.9.2.4
Measuring the operate value for the dead line detection function
1.
Apply three-phase voltages with their rated value and zero currents.
2.
Decrease the measured voltage in one phase until the DLD1PH signal appears.
3.
This is the point at which the dead line condition is detected. Check the value of
the decreased voltage with the set value UDLD< (UDLD< is in percentage of the
base voltage
UBase
).
4.
Apply three-phase currents with their rated value and zero voltages.
5.
Decrease the measured current in one phase until the DLD1PH signal appears.
6.
This is the point at which the dead line condition is detected. Check the value of
the decreased current with the set value IDLD< (IDLD< is in percentage of the
base current
IBase
).
12.9.2.5
Checking the operation of the du/dt and di/dt based function
Check the operation of the du/dt and di/dt based function if included in the IED.
1.
Simulate normal operating conditions with the three-phase currents in phase
with their corresponding phase voltages and with all of them equal to their rated
values.
2.
Change the voltages and currents in all three phases simultaneously.
The voltage change must be greater than the set value for
DU>
and the current
change must be less than the set value for
DI<
.
•
The BLKU and BLKZ signals appear without any time delay. The BLKZ
signal will be activated only if the internal deadline detection is not
activated at the same time.
•
3PH should appear after 5 seconds, if the remaining voltage levels are
lower than the set
UDLD<
of the DLD function.
3.
Apply normal conditions as in step
.
The BLKU, BLKZ and 3PH signals should reset, if activated, see step
4.
Change the voltages and currents in all three phases simultaneously.
The voltage change must be greater than the set value for
DU>
and the current
change must be more than the set value for
DI<
.
The BLKU, BLKZ and 3PH signals should not appear.
5.
Repeat step
6.
Connect the nominal voltages in all three phases and feed a current below the
operate level in all three phases.
7.
Keep the current constant. Disconnect the voltage in all three phases
simultaneously.
The BLKU, BLKZ and 3PH signals should not appear.
Section 12
1MRK502053-UEN B
Testing functionality by secondary injection
200
Generator protection REG670 2.0 IEC
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...