settled, and also if the average impedance is based on enough values so that
statistically the signal noise is “filtered out”. This results in a fairly accurate
impedance measurement which can be used as an alternative reference.
5.
Click the
Select
button when the standard deviation has converged so that its
magnitude is within the noise level of the measured absolute impedance.
In the second commissioning sub tab, Step2 : Save Reference Impedance, the
measured real and imaginary reference 2 impedance is presented.
6.
Select the
Submit to Parameter setting
button.
This forwards the newly acquired reference to Parameter setting.
7.
Write the newly acquired real and imaginary parts of Reference 2 to IED.
6.6
Verifying calibration
After the calibration is performed, it is appropriate to verify that known faults are
measured as expected and that the function is indicating trips and alarms when it
should, in other words that the calibration was successful. For this purpose the
monitoring feature can be used.
1.
In the ICT toolbar, select the fourth tab,
Monitoring
.
Logger feature
Currently measured
impedance and its
average
Selectable quantity for
plotting
Selectable graph
update period
Currently used reference
IEC11000050-1-en.vsd
GUID-DCE099B6-4DBA-4A52-9566-0E20B8AF7712 V1 EN
Figure 15:
Monitoring tab
2.
Set the graph update period to one second by typing 1 into the
Graph update
period
field.
3.
To start continuously plotting values on the graph with one second interval,
select
Start readings from IED
.
Section 6
1MRK502053-UEN B
Calibrating injection based sensitive rotor earth fault protection
64
Generator protection REG670 2.0 IEC
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...