11. Check that trip and alarm contacts operate according to the configuration logic.
12. Set the cooling time constant temporarily to min value (1min.) to quickly lower
the thermal content.
13. Wait for a period equal to 6 times
Tcooling
switch 20 minutes on a voltage 1.15 ·
V/Hz>
and check the inverse operate time.
Wait until the thermal memory is emptied, set the cooling time constant
according to the setting plan and check another point on the inverse time curve
injecting a voltage 1.3 ·
V/Hz>
.
14. Finally check that START and TRIP information is stored in the event menu.
12.6.4.2
Completing the test
Continue to test another function or end the test by changing the
TestMode
setting to
Off
. Restore connections and settings to their original values, if they were changed for
testing purposes.
12.6.5
Voltage differential protection VDCPTOV
Prepare the IED for verification of settings as outlined in section
and
in this chapter.
12.6.5.1
Check of undervoltage levels
This test is relevant if the setting
BlkDiffAtULow
=
Yes
.
Check of U1Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure
2.
Apply voltage higher than the highest set value of
UDTrip
,
U1Low
and
U2Low
to the U1 three-phase inputs and to one phase of the U2 inputs according to
figure
.
The voltage differential START signal is set.
1MRK502053-UEN B
Section 12
Testing functionality by secondary injection
Generator protection REG670 2.0 IEC
181
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...