WA1
WA2
WA1_QA1
(SESRSYN 1)
WA2_QA1
(SESRSYN 3)
TIE_QA1
(SESRSYN 2)
LINE1
LINE2
LINE1_QB9
LINE2_QB9
IEC11000274-3-en.vsd
IEC11000274 V3 EN
Figure 54:
Objects used in the voltage selection logic
12.10.1.5
Completing the test
Continue to test another function or end the test by changing the
TestMode
setting to
Off
. Restore connections and settings to their original values, if they were changed for
testing purposes.
12.10.2
Apparatus control APC
The apparatus control function consists of four types of function blocks, which are
connected in a delivery-specific way between bays and to the station level. For that
reason, test the total function in a system, that is, either in a complete delivery system
as an acceptance test (FAT/SAT) or as parts of that system.
If a block/unblock command is sent from remote to function, while the
IED is shut down, this command will not be recognized after the start
up, thus the command that was sent prior to the shut down is used. In
such cases, where there is a mismatch, the user is advised to make a
complete cycle of block/unblock operations to align the statuses.
1MRK502053-UEN B
Section 12
Testing functionality by secondary injection
Generator protection REG670 2.0 IEC
211
Commissioning manual
Summary of Contents for REG670 2.0 IEC
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Page 2: ......
Page 16: ...10 ...
Page 30: ...24 ...
Page 58: ...52 ...
Page 62: ...56 ...
Page 76: ...70 ...
Page 90: ...84 ...
Page 94: ...88 ...
Page 108: ...102 ...
Page 246: ...240 ...
Page 252: ...246 ...
Page 267: ...261 ...