11. Inject current in one phase to about 110% of the set operate current
(
IN>Dir
).
12. Activate the CRL binary input.
No ECHO and TRWEI should appear.
13. Abruptly reverse the current to 65° lagging the voltage to operate the forward
directional element.
No ECHO and TRWEI should appear.
14. Switch the current off and check that the ECHO, CS and TRWEI appear on
the corresponding binary output during 200ms after resetting the directional
element. If EF4PTOC also operates in forward direction, CS should be
obtained.
15. Switch the polarizing voltage off and reset the CRL binary input.
9.9.5.3
Completing the test
M13936-90 v5
Continue to test another function or end the test by changing the
TESTMODE
setting to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
9.10
Logic
SEMOD53577-1 v1
9.10.1
Tripping logic, common 3-phase output SMPPTRC
SEMOD54375-102 v10
Prepare the IED for verification of settings outlined in Section
.
This function is functionality tested together with other protection functions (line
differential protection, earth-fault overcurrent protection, and so on) within the
IED. It is recommended that the function is tested together with the autorecloser
function, when built into the IED or when a separate external unit is used for
reclosing purposes.
9.10.1.1
3 phase operating mode
SEMOD54375-106 v10
1.
Check that
AutoLock
and
TripLockout
are both set to
Off
.
2.
Initiate a three-phase fault.
1MRK 506 383-UEN A
Section 9
Testing functionality by secondary injection
Line distance protection REL650 2.2 IEC
157
Commissioning manual
Summary of Contents for REL650 series
Page 1: ...RELION 650 SERIES Line distance protection REL650 Version 2 2 Commissioning manual...
Page 2: ......
Page 24: ...18...
Page 28: ...22...
Page 38: ...32...
Page 54: ...48...
Page 58: ...52...
Page 178: ...172...
Page 182: ...176...
Page 188: ...182...
Page 196: ...190...
Page 206: ...200...
Page 207: ...201...