Section 4
Mounting
4.1
Checking environmental conditions and mounting
space
The mechanical and electrical environmental conditions at the installation site must
be within the limits described in the technical manual.
•
Avoid installation in dusty, damp places.
Avoid places susceptible to rapid temperature variations, powerful vibrations
and shocks, surge voltages of high amplitude and fast rise time, strong induced
magnetic fields or similar extreme conditions.
•
Check that sufficient space is available.
Sufficient space is needed at the front and rear of the IED to allow access to
wires and optical fibres and to enable maintenance and future modifications.
•
Ensure that flush-mounted IEDs can be added and replaced without excessive
dismantling.
4.2
Detaching and installing the plug-in unit
4.2.1
Detaching the plug-in unit
Before detaching the plug-in unit from the case, the auxiliary
voltage must be disconnected.
1.
Turn off the power.
2.
Open the seal on the front panel by removing the sealing wire and screw the
sealing screw all the way in.
3.
Lift the handle to 90 degrees to release the latching mechanism.
The plug-in unit is pushed about 7 mm out of the case and the connectors are
separated.
4.
Pull the unit out of the case.
1MRS756375 K
Section 4
Mounting
615 series
13
Installation Manual
Summary of Contents for Relion 615 series
Page 1: ...Relion Protection and Control 615 series Installation Manual ...
Page 2: ......
Page 8: ......
Page 11: ...Section 9 Glossary 73 Table of contents 615 series 3 Installation Manual ...
Page 12: ...4 ...
Page 78: ...70 ...
Page 80: ...72 ...
Page 82: ...74 ...
Page 83: ...75 ...