4.3.2
Flush mounting the IED
All the mounting elements are integrated in the IED.
Requirements for installation:
•
Panel cut-out of 165.5 x 161.5 mm
•
Depth behind the panel 153 mm
An IED equipped with optical connections requires a minimum
depth of 180 mm. The allowed minimum bending radius has to be
checked from the optical cable manufacturer.
1.
Loosen the four M5 fixing screws in the case to fit the case into the panel cut-
out.
2.
Mount the case to the panel cut-out.
1MRS756375 K
Section 4
Mounting
615 series
19
Installation Manual
Summary of Contents for Relion 615 series
Page 1: ...Relion Protection and Control 615 series Installation Manual ...
Page 2: ......
Page 8: ......
Page 11: ...Section 9 Glossary 73 Table of contents 615 series 3 Installation Manual ...
Page 12: ...4 ...
Page 78: ...70 ...
Page 80: ...72 ...
Page 82: ...74 ...
Page 83: ...75 ...