•
Raising frame
•
Gasket
•
Screws
Requirements for installation:
•
Panel cut-out of 165.5 x 161.5 mm with mounting holes
•
Depth behind the panel 103 mm
•
When IP 54 degree of protection (according to IEC 60529) is required for the
front side, a gasket has to be used in the installation.
1.
Mount the raising frame into the panel cut-out with four M4 screws.
A
B
E
C
D
1 2 3
A070589 V4 EN
Figure 9:
Mounting the raising frame
A 173.5 ±0.3 mm
1 Panel
B 165.5 ±1 mm
2 Raising frame
C 161.5 ±1 mm
3 M4 screw
D 133 ±0.3 mm
E ∅ 5.5 mm
2.
Loosen the four M5 fixing screws in the case to fit the case to the raising frame.
3.
Mount the case to the raising frame.
1MRS756375 K
Section 4
Mounting
615 series
23
Installation Manual
Summary of Contents for Relion 615 series
Page 1: ...Relion Protection and Control 615 series Installation Manual ...
Page 2: ......
Page 8: ......
Page 11: ...Section 9 Glossary 73 Table of contents 615 series 3 Installation Manual ...
Page 12: ...4 ...
Page 78: ...70 ...
Page 80: ...72 ...
Page 82: ...74 ...
Page 83: ...75 ...