1
2
3
GUID-90BDC1BA-F671-4178-8136-8E8D9E56A7A3 V1 EN
Figure 30:
Installation plates for replacing SP_J3/J6 relay in 19" rack
1 Installation plate
2 Torx head screw M6x20
3 Hexagon nut M6
2.
Tighten the screws.
3.
Mount the new IED with the mounting frame to the installation plate.
For ordering numbers, see the ordering number table.
4.3.13
Replacing a Strömberg SP_J6 series relay by a 615 series
IED
1.
Drill new screw holes (
∅
4.5 mm) to the panel according to the dimensional
drawing.
1MRS756375 K
Section 4
Mounting
615 series
43
Installation Manual
Summary of Contents for Relion 615 series
Page 1: ...Relion Protection and Control 615 series Installation Manual ...
Page 2: ......
Page 8: ......
Page 11: ...Section 9 Glossary 73 Table of contents 615 series 3 Installation Manual ...
Page 12: ...4 ...
Page 78: ...70 ...
Page 80: ...72 ...
Page 82: ...74 ...
Page 83: ...75 ...