Engineering Guide provides information for IEC 61850 engineering of 

Engineering Guide provides information for IEC 61850 engineering of 

the 615

the 615

series protection IEDs with PCM600 

series protection IEDs with PCM600 

and CCT600. This quide concentrates

and CCT600. This quide concentrates

especially on the configuration of GOOSE communication with these tools. The

especially on the configuration of GOOSE communication with these tools. The

guide can be used as a technical reference during the engineering phase,

guide can be used as a technical reference during the engineering phase,

installation and commissioning phase, and during normal service. 

installation and commissioning phase, and during normal service. 

For more details

For more details

on tool usage, see the PCM600 documentation.

on tool usage, see the PCM600 documentation.

This manual addresses the system engineers and installation 

This manual addresses the system engineers and installation 

and commissioning

and commissioning

 personnel.

 personnel.

The system engineer must have a 

The system engineer must have a 

thorough knowledge of protection systems,

thorough knowledge of protection systems,

 protection equipment, protection functions an

 protection equipment, protection functions an

d the configured functional logic in

d the configured functional logic in

the IEDs. The installation 

the IEDs. The installation 

and commissioning personnel must have basic

and commissioning personnel must have basic

knowledge of how to handle the electronic equipment.

knowledge of how to handle the electronic equipment.

1MRS756475 D

1MRS756475 D

Section 1

Section 1

Introduction

Introduction

3

3

Engineering Guide

Engineering Guide

Summary of Contents for Relion 615 series

Page 1: ...Relion Relion Protection and Control Protection and Control IEC 61850 IEC 61850 615 series 615 series Engineering Guide Engineering Guide...

Page 2: ......

Page 3: ...1MRS756475 Document ID 1MRS756475 Issued 03 07 2009 Issued 03 07 2009 Revision D Revision D Product version 2 0 Product version 2 0 Copyright 2009 ABB All rights reserved Copyright 2009 ABB All right...

Page 4: ...accordance with the terms of such license license ABB and Relion are registered trademarks of ABB Group All other brand or ABB and Relion are registered trademarks of ABB Group All other brand or pro...

Page 5: ...risk for harm to property or persons including but not limited to personal injuries or death shall be the sole responsibility of the not limited to personal injuries or death shall be the sole respons...

Page 6: ...uipment for use within specified voltage limits Low voltage directive 2006 95 EC This conformity is the result of 2006 95 EC This conformity is the result of tests conducted by ABB in tests conducted...

Page 7: ...earthed The frame of the IED has to be carefully earthed When the plug in unit has been detached from the case do not When the plug in unit has been detached from the case do not touch the inside of t...

Page 8: ......

Page 9: ...5 Vertical c Vertical communication diagnostic counters 16 ommunication diagnostic counters 16 Paramete Parameter setting and disturbance re r setting and disturbance recorder corder 16 16 Horizontal...

Page 10: ...ckgroun Background sending d sending 35 35 Default value handling 35 Default value handling 35 Alarm supe Alarm supervision in ap rvision in application plication 36 36 Diagnostic counters 36 Diagnost...

Page 11: ...re details on tool usage see the PCM600 documentation on tool usage see the PCM600 documentation This manual addresses the system engineers and installation This manual addresses the system engineers...

Page 12: ...tion protocol manual manual Technical manual Technical manual Technical manual Technical manual en07000220 vsd en07000220 vsd IEC07000220 V1 EN IEC07000220 V1 EN Fi Figu gure re 1 1 Th The i e int nte...

Page 13: ...y descriptions and lists function blocks logic diagrams input and output function blocks logic diagrams input and output signals setting parameters and signals setting parameters and technical data so...

Page 14: ...ption of software or damage of a hazard which could result in corruption of software or damage to equipment or property to equipment or property The information icon alerts the reader to important fac...

Page 15: ...quo quotat tation ion mar marks ks for for exa exampl mple e The corresponding parameter values are On and The corresponding parameter values are On and Off Off IED i IED inpu nput o t outp utput me...

Page 16: ...8 8...

Page 17: ...i io on n l la an ng gu ua ag ge e f fo or r communication in electrical substations related to communication in electrical substations related to IEDs IEDs Impact on engineering Impact on engineering...

Page 18: ...ad range of features from broad range of features from mainstream communication standard parts mainstream communication standard parts 8 1 9 2 8 1 9 2 Therefore IEC 61850 is also open for Therefore IE...

Page 19: ...kage versions for different system products and tools Connectivity Connectivity Package Manager is included in Package Manager is included in products supporting the connectivity concept products supp...

Page 20: ...ring Pro the devices PCM600 Engineering Pro including the communication configuration tool CCT600 is needed including the communication configuration tool CCT600 is needed to engineer an to engineer a...

Reviews: