Section 8
Removing, repairing and exchanging
8.1
Product lifecycle
GUID-D1A48469-E2DB-4E39-8431-1686F13FFC4D v4
In the product lifecycle, there is going to be a time to upgrade the IED to a next generation
unit. At some point of the product lifecycle, the IED will be upgraded to a next generation unit.
When selecting the original product, already consider the upgrading and extension
possibilities that the specific product offers for its whole lifecycle.
8.2
Checking IED information
GUID-4B51B25E-32AA-4015-9A20-BF2850B3EE35 v5
The IED information includes detailed information about the device, such as version and serial
number.
1.
Select Main Menu/Diagnostics/IED status.
2.
Select a submenu with and .
3.
Enter the selected submenu with .
4.
Browse the information with and .
The Product identifiers submenu contains product related information including product
type, serial number, order number, production date and SW version.
The Installed HW submenu contains information about the HW modules.
8.3
Removing the IED
GUID-A2FC8418-009E-4542-AFAB-9545836405EF v2
Before removing the IED, make sure that auxiliary power is turned off and all wiring is
disconnected.
Check with your local ABB if the IED can be upgraded.
8.4
Sending the IED for repair
AMU0600445 v4
In case of product problems, contact the nearest ABB office or representative for consultation
and instructions.
8.5
Exchanging the IED
GUID-1EB39784-696C-4B2E-B560-4115F721DCAB v6
To exchange the IED with another identical unit, remove the IED and install the new one.
Contact your local ABB for information about exchangeable units.
Check with your local ABB if the IED can be upgraded.
1MRK 514 014-UEN A
Section 8
Removing, repairing and exchanging
650 series
39
Installation manual
© Copyright 2011 ABB. All rights reserved