4.
Check that the MANENOK output is activated after set
tManEnerg
.
5.
Increase the U-Bus to 80%
GblBaseSelBus
and keep the U-Line equal to 30%
GblBaseSelLine
. The outputs should not be activated.
6.
Repeat the test with
ManEnerg
set to
DLLB
with different values on the U-Bus
and the U-Line voltage.
10.10.1.4
Testing the voltage selection
Testing the voltage selection for single CB arrangements
This test should verify that the correct voltage is selected for the measurement in the
SESRSYN function used in a double-bus arrangement. Apply a single-phase voltage
of 100%
GblBaseSelLine
to the U-Line and a single-phase voltage of 100%
GblBaseSelBus
to the U-Bus.
If the UB1/2OK inputs for the fuse failure are used, they must be activated, during
tests below. Also verify that deactivation prevents operation and gives an alarm.
1.
Connect the signals above to binary inputs and binary outputs.
2.
Connect the voltage inputs to the analog inputs used for each bus or line
depending of the type of busbar arrangement and verify that correct output
signals are generated.
Testing the voltage selection for double breaker
This test should verify that correct voltage is selected for the measurement in the
SESRSYN function used for a diameter in a One-and-a-half breaker arrangement.
Apply a single-phase voltage of 100%
GblBaseSelLine
to the U-Line and a single-
phase voltage of 100%
GblBaseSelBus
to the U-Bus. Verify that correct output signals
are generated.
1.
Connect the analog signals to the voltage inputs, in pair of two for U1 and U2.
(Inputs U3PBB1, U3PBB2, U3PLN1, U3PLN2)
2.
Activate the binary signals according to the used alternative. Verify the
measuring voltage on the synchronizing check function SESRSYN. Normally it
can be good to verify synchronizing check with the same voltages and phase
angles on both voltages. The voltages should be verified to be available when
selected and not available when another input is activated so connect only one
voltage transformer reference at each time.
3.
Record the voltage selection tests in a matrix table showing read values and
AUTOSYOK/MANSYOK signals to document the test performed.
Testing the voltage selection for 1 1/2 CB arrangements
At test of the SESRSYN function for a 1½ CB diameter the following alternative
voltage inputs can be used for the three SESRSYN (SESRSYN 1, SESRSYN 2,
SESRSYN 3) functions. These three SESRSYN functions can either be in one, two or
three different IEDs. Table
describes the scenario when SESRSYN 1, SESRSYN
2 and SESRSYN 3 all are in the same IED. If SESRSYN 3 is in another IED, WA1 will
1MRK 506 355-UEN A
Section 10
Testing functionality by secondary injection
Line distance protection REL670 2.1 IEC
201
Commissioning manual
Summary of Contents for Relion 670 Series REL670
Page 1: ...Relion 670 series Line distance protection REL670 2 1 IEC Commissioning manual ...
Page 2: ......
Page 30: ...24 ...
Page 34: ...28 ...
Page 64: ...58 ...
Page 68: ...62 ...
Page 90: ...84 ...
Page 254: ...248 ...
Page 260: ...254 ...
Page 269: ...263 ...