12.2.2.8
Restoring
Maintenance is very important to improve the availability of the protection system by
detecting failures before the protection is required to operate. There is however little
point in testing healthy equipment and then putting it back into service with an open
terminal, with a removed fuse or open miniature circuit breaker with an open
connection, wrong setting, and so on.
Thus a list should be prepared of all items disturbed during test so that all can be put
back into service quickly and without overlooking something. It should be put back
into service item by item and signed by the responsible engineer.
1MRK 506 355-UEN A
Section 12
Commissioning and maintenance of the fault clearing system
Line distance protection REL670 2.1 IEC
253
Commissioning manual
Summary of Contents for Relion 670 Series REL670
Page 1: ...Relion 670 series Line distance protection REL670 2 1 IEC Commissioning manual ...
Page 2: ......
Page 30: ...24 ...
Page 34: ...28 ...
Page 64: ...58 ...
Page 68: ...62 ...
Page 90: ...84 ...
Page 254: ...248 ...
Page 260: ...254 ...
Page 269: ...263 ...