Introduction to the installation and
commissioning manual
Chapter 1
Introduction
1
Introduction to the installation and commissioning
manual
1.1
About the complete set of manuals for an IED
The user’s manual (UM) is a complete set of four different manuals:
The Application Manual (AM)
contains application descriptions, setting guidelines and setting
parameters sorted per function. The application manual should be used to find out when and for
what purpose a typical protection function could be used. The manual should also be used when
calculating settings.
The Technical Reference Manual (TRM)
contains application and functionality descriptions
and it lists function blocks, logic diagrams, input and output signals, setting parameters and tech-
nical data sorted per function. The technical reference manual should be used as a technical ref-
erence during the engineering phase, installation and commissioning phase, and during normal
service.
The Installation and Commissioning Manual (ICM)
contains instructions on how to install
and commission the protection IED. The manual can also be used as a reference during periodic
testing. The manual covers procedures for mechanical and electrical installation, energizing and
checking of external circuitry, setting and configuration as well as verifying settings and per-
forming directional tests. The chapters are organized in the chronological order (indicated by
chapter/section numbers) in which the protection IED should be installed and commissioned.
The Operator’s Manual (OM)
contains instructions on how to operate the protection IED dur-
ing normal service once it has been commissioned. The operator’s manual can be used to find
out how to handle disturbances or how to view calculated and measured network data in order
to determine the cause of a fault.
1.2
About the installation and commissioning manual
The installation and commissioning manual contains the following chapters:
•
The chapter
“Safety information”
presents warning and note signs, that the user
should pay attention to.
•
The chapter
“Overview”
is a summary of the major tasks faced when installing
and commissioning an IED.
Application
manual
Technical
reference
manual
Installation and
commissioning
manual
Operator´s
manual
en01000044.vsd
Summary of Contents for RELION REL670
Page 8: ...Contents ...
Page 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Page 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Page 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Page 198: ...190 Glossary Chapter 14 Glossary ...