145
Control
Chapter 11
Verifying settings by secondary
injection
11.2.4
Checking the reclosing conditions
When checking the influence of a releasing condition it is suggested to first run a sequence with
the condition fulfilled. When the condition signal is removed, and a new sequence is run, it in-
dicates that the result was due to the changed condition. In case of a blocking signal the proce-
dure should be similar. Start without the blocking or inhibit signal, and then run a sequence with
the blocking or inhibit signal added.
Checking the influence of the INHIBIT signal
Procedure
1.
Check that the auto-reclosing function is operative, e.g. by making a
reclosing shot without the INHIBIT signal.
2.
Apply a fault and thereby a START signal. At the same time, or during
the open time, apply a signal to the input INHIBIT.
3.
Check that the reclosing sequence is interrupted and no reclosing
takes place.
Check closing onto a fault
Procedure
1.
Check that the reclosing function is operative, e.g. by making a re-
closing shot.
Keep the CBREADY signal high.
2.
Set the breaker simulating relay BR in Open position.
3.
Close the BR relay and apply immediately a fault and thereby a
START signal.
4.
Check that no reclosing takes place.
Checking the influence of CB not ready for reclosing
Procedure
1.
Check that the auto-reclosing function is operative, e.g. by making a
reclosing shot.
Keep the CB simulator BR closed. Remove the CBREADY signal by
opening SRY.
2.
Apply a fault and thereby a START signal.
3.
Check that no reclosing takes place.
Summary of Contents for RELION REL670
Page 8: ...Contents ...
Page 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Page 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Page 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Page 198: ...190 Glossary Chapter 14 Glossary ...