1. Change the magnitude and angle of the voltage to achieve impedances at test
points P1, P2, P3 and P4.
2. For each test point, check that the output signals START and STZx (where, x
is 1- 3 depending on the zone selected) are activated.
3. Signals TRIP and TRZx will be activated after operate time delay
tZx
for the
respective zone has elapsed.
Verifying quadrilateral characteristic
GUID-12731067-DB7D-4FEB-9529-40016BAC3159 v2
To verify zone quadrilateral characteristic, at least 10 points must be tested.
6
1
6
1
6
1
2
3
8
4
5
9
IEC15000199-2-en.vsdx
P5
P6
P7
P1
P2
P8
P9
P10
P3
7
P4
jX (
Ω)
R (
Ω)
IEC15000199 V2 EN-US
Figure 23:
Commissioning test points for Quad non-dir characteristic
1.
RFFwZx
2.
ZxFwd
3.
ImpCharAng
4.
ZxFwd * cos(ImpCharAng)
5.
ZxFwd * sin(ImpCharAng)
6.
RFRevZx
7.
ZxRev
8.
ZxRev * cos(ImpCharAng)
9.
ZxRev * sin(ImpCharAng)
Where x = 1, 2 and 3.
1MRK 506 377-UEN C
Section 10
Testing functionality by secondary injection
Railway application RER670 2.2 IEC
103
Commissioning manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Page 2: ......
Page 26: ...20...
Page 54: ...48...
Page 58: ...52...
Page 62: ...56...
Page 80: ...74...
Page 188: ...182...
Page 194: ...188...
Page 204: ...198...
Page 214: ...208...
Page 215: ...209...