Two step undervoltage protection U2RWPTUV........................ 120
Verifying the settings............................................................ 120
Completing the test.............................................................. 121
Two step overvoltage protection O2RWPTOV..........................121
Verifying the settings............................................................ 121
Completing the test.............................................................. 122
Two step residual overvoltage protection ROV2PTOV ............ 122
Verifying the settings............................................................ 122
Completing the test.............................................................. 123
Frequency protection......................................................................123
Underfrequency protection SAPTUF ........................................123
Verifying the settings............................................................ 123
Completing the test.............................................................. 124
Secondary system supervision.......................................................124
Current circuit supervision CCSSPVC.......................................124
Fuse failure supervision FRWSPVC..........................................125
Checking that the binary inputs and outputs operate as
function.................................................................................125
Checking the operation of the du/dt and di/dt based
Voltage based delta supervision DELVSPVC........................... 126
Verifying the signals and settings.........................................126
Completing the test.............................................................. 127
Current based delta supervision DELISPVC.............................128
Delta supervision of real input DELSPVC................................. 129
Synchrocheck, energizing check, and synchronizing
SESRSYN................................................................................. 129
Testing the synchronizing function....................................... 130
Testing the synchrocheck functionality.................................131
Testing the energizing check................................................134
Completing the test.............................................................. 135
Autoreclosing for railway system SMBRREC............................135
Preparation of the verification ..............................................137
Switching the auto recloser to
On and Off............................138
Table of contents
Railway application RER670 2.2 IEC
5
Commissioning manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Page 2: ......
Page 26: ...20...
Page 54: ...48...
Page 58: ...52...
Page 62: ...56...
Page 80: ...74...
Page 188: ...182...
Page 194: ...188...
Page 204: ...198...
Page 214: ...208...
Page 215: ...209...