Test of phase difference
3.
Change the phase angle bdφ and -dφ and verify that the two outputs
are activated for phase differences between these values but not for phase
differences outside, see figure
Testing the frequency difference
M2377-232 v9
The frequency difference test should verify that operation is achieved when the
FreqDiffA
and
FreqDiffM
frequency difference is lower than the set value for
manual and auto synchronizing check,
FreqDiffA
and
FreqDiffM
respectively and
that operation is blocked when the frequency difference is greater.
Test with frequency difference = 0 mHz
Test with a frequency difference outside the set limits for manual and auto
synchronizing check respectively.
1.
Apply voltages U-Line equal to 100%
GblBaseSelLine
and U-Bus equal to
100%
GblBaseSelBus
, with a frequency difference equal to 0 mHz and a
phase difference lower than the set value.
2.
Check that the AUTOSYOK and MANSYOK outputs are activated.
3.
Apply voltage to the U-Line equal to 100%
GblBaseSelLine
with a frequency
equal to 16.7 Hz and voltage U-Bus equal to 100%
GblBaseSelBus
, with a
frequency outside the set limit.
4.
Check that the two outputs are not activated. The test can be repeated with
different frequency values to verify that the function operates for values lower
than the set ones. If a modern test set is used, the frequency can be changed
continuously.
Testing the reference voltage
M2377-249 v5
1.
Use the same basic test connection as in figure
1MRK 506 377-UEN C
Section 10
Testing functionality by secondary injection
Railway application RER670 2.2 IEC
133
Commissioning manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Page 2: ......
Page 26: ...20...
Page 54: ...48...
Page 58: ...52...
Page 62: ...56...
Page 80: ...74...
Page 188: ...182...
Page 194: ...188...
Page 204: ...198...
Page 214: ...208...
Page 215: ...209...