1.
Check the function settings on the local HMI under
Main menu/
Settings/IED Settings/Control/Autorecloser79,5(0–>1)/
SMBRREC:x(79,5(0–>)):x
If any timer settings are reduced to speed up or facilitate the testing, they shall
be set to normal after testing. A temporary label on the IED can be a reminder
to restore normal settings after which a verification test should be performed.
2.
Decide if a synchrocheck function SESRSYN shall be included in the test.
If SESRSYN as an internal function or external device is not operated by the
injection, input signal SYNC must be connected as a permanent high signal or
controlled by a switch.
3.
Read and make notes of the reclosing operation counters on the local HMI
under
Main menu/Test/Function status/Control/AutoRecloser79,5(0–>1)/
SMBRREC(79,5(0–>1)):x
Possibly reset the counters to
Zero
. Counters are reset in the reset menu.
4.
Make arrangements for the simulation of the CB, for example as in Figure
5.
Make arrangements for indication, recording and time measurements.
The signals for CBCLOSED, START, CLOSECB, READY and other
relevant signals should preferably be arranged for event recording with time
tagging. If that is not possible, other means of time measurement and
recording should be arranged.
10.9.2.2
Switching the auto recloser to
On and Off
M12400-79 v9
1.
Set the
Operation
setting to
Off
and check the state.
2.
Set the
Operation
setting to
On
and check the state, including
SETON
and
READY
.
The circuit breaker should be closed and ready.
3.
If external control inputs OFF/ON are used, check that they work. Set
ExternalCtrl
=
On
and use the control inputs to switch On and Off, and check
the state of the function.
10.9.2.3
Verifying the auto recloser
M12400-91 v12
Select the test cases to be run according to what is applicable to the particular
application. It can be, for example,
•
single-shot reclosing
•
two-shot reclosing
Below, a case with single-shot reclosing is described.
1.
Set
Operation
=
On
.
2.
If the synchrocheck SESRSYN is not to be operated, ensure that the signal
SYNC input is activated. If SESRSYN is to be included, ensure that it is
supplied with the appropriate AC quantities.
3.
Simulate CB closed position by closing switch SC to make the BR relay start.
Section 10
1MRK 506 377-UEN C
Testing functionality by secondary injection
138
Railway application RER670 2.2 IEC
Commissioning manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Page 2: ......
Page 26: ...20...
Page 54: ...48...
Page 58: ...52...
Page 62: ...56...
Page 80: ...74...
Page 188: ...182...
Page 194: ...188...
Page 204: ...198...
Page 214: ...208...
Page 215: ...209...