4.
Activate
BLOCK
binary input and check that the outputs
TEMPALM
,
TEMPLO
,
ALARM
and
LOCKOUT
disappear.
5.
Reset the
BLOCK
binary input.
6.
Make sure that temperature lockout condition exists and then activate the
reset lock out input
RESETLO
and check that the outputs
TEMPLO
and
LOCKOUT
reset.
10.12.2.3
Completing the test
GUID-1A0D8AF0-4C48-45E8-B31D-96734ED1A4D2 v2
Continue to test another function or end the test by changing the
TestMode
setting
to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
10.12.3
Breaker monitoring SSCBR
GUID-10D26C82-79FF-4EAD-AE4A-2F2DBE965087 v3
Prepare the IED for verification of settings outlined in section “Testing the IED
operation”.
The Signal Monitoring tool in PCM600 shows the service values that are available
on the Local HMI as well.
Values of the logical signals belong to the breaker monitoring are available on the
local HMI under:
Main menu/Test/Function status/Monitoring/
BreakerMonitoring/SSCBR:x
10.12.3.1
Verifying the settings
GUID-962A344D-5F8D-49A6-B3AC-29C7FEED0A3D v4
1. Connect the test set for the injection of a three-phase current to the appropriate
current terminals of the IED.Connect the test set for the injection of a two-
phase current to the appropriate current terminals of the IED.
2. If current need to be injected for a particular test, it should be done in the
phase selected by the
PhSel
parameter.
3. Follow the sequence for positioning the auxiliary contacts before testing:
POSCLOSE
0
1
0
POSOPEN
0
0
1
4. Test of CB contact travel time
4.1. Test the set timing defined by
OpenTimeCorr
,
CloseTimeCorr
,
tTrOpenAlm
and
tTrCloseAlm
.
4.2. Change the status of the auxiliary contacts such that travel time to open
TTRVOP
and travel time to close
TTRVCL
exceed the respective set
values (
tTrOpenAlm
and
tTrCloseAlm
). The measured travel time for
opening and closing is shown on
TTRVOP
and
TTRVCL
respectively.
4.3. Check that
TRVTOPAL
and
TRVTCLAL
are activated.
5. Test of CB status
Section 10
1MRK 506 377-UEN C
Testing functionality by secondary injection
166
Railway application RER670 2.2 IEC
Commissioning manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Page 2: ......
Page 26: ...20...
Page 54: ...48...
Page 58: ...52...
Page 62: ...56...
Page 80: ...74...
Page 188: ...182...
Page 194: ...188...
Page 204: ...198...
Page 214: ...208...
Page 215: ...209...