10.13
Metering
SEMOD53588-1 v1
10.13.1
Pulse-counter logic PCFCNT
M13405-2 v7
The test of the Pulse-counter logic function PCFCNT requires the Parameter
Setting tool in PCM600 or an appropriate connection to the local HMI with the
necessary functionality. A known number of pulses with different frequencies are
connected to the pulse counter input. The test should be performed with settings
Operation
=
On
or
Operation
=
Off
and the function blocked or unblocked. The
pulse counter value is then checked in PCM600 or on the local HMI.
10.13.2
Function for energy calculation and demand handling
ETPMMTR
GUID-4FC03017-93BD-4B30-A874-487BF89971D5 v1
Prepare the IED for verification of settings as outlined in section ”Overview “ and
section ”Preparing for test“ in this chapter.
10.13.2.1
Verifying the settings
GUID-F8F0D384-BC70-48CA-817E-EB9BFBD68A54 v3
Common test equipment can be used to determine the injection of current and
voltage and time measurement.
Verification of EAFACC & ERFACC output
1. Connect the test set for injection of two-phase currents and two-phase voltage
to the appropriate current and voltage terminals of the IED.
2. Ensure the instantaneous values of active and reactive power from CVMMXN
function block are connected to ETPMMTR function block active and reactive
power inputs.
3. Enable the
EnaAcc
setting and set
tEnergy
as 1 minute.
4. Activate the
STARTACC
input and supply the IED with two-phase currents
and voltages at their rated value.
5. Check that the
ACCINPRG
signal appears continuously.
6. Note the
EAFACC
and
ERFACC
value after 1 minute and compare it with
calculated energy value.
7. Similarly check after each 1 minute whether the calculated integrated energy
value and
EAFACC
and
ERFACC
outputs are matching.
8. After some time (multiple of minute) remove the current and voltage input
from CVMMXN function block.
9. Check the
EAFACC
and
ERFACC
output in the next 1 minute cycle for the
retaining the same value.
1MRK 506 377-UEN C
Section 10
Testing functionality by secondary injection
Railway application RER670 2.2 IEC
177
Commissioning manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Page 2: ......
Page 26: ...20...
Page 54: ...48...
Page 58: ...52...
Page 62: ...56...
Page 80: ...74...
Page 188: ...182...
Page 194: ...188...
Page 204: ...198...
Page 214: ...208...
Page 215: ...209...