10.3.2.5
Verifying the differential alarm
GUID-81496723-AF55-41A1-9EDB-711E28D3DBAC v2
1.
Use settings for the installation.
2.
Inject currents corresponding to the transformer rated current on both sides so
that the differential current is 0% and the bias current is 100%.
3.
Decrease the injected current on one side until IDALARM is set, and note the
value and alarm delay.
4.
Increase the injected current until IDALARM resets, and note the value.
10.3.2.6
Verifying the blocking functionality
GUID-B7A67797-F6BE-45CB-8502-A4C26119430A v2
1.
Use the settings for the installation.
2.
Inject currents corresponding to the transformer rated current on both sides so
that the differential current is 0% and the bias current is 100%.
3.
Decrease the injected current on one side until TRRES is set.
4.
Increase the 2nd harmonic on one side above
I2/I1Ratio
and verify that
TRRES is reset (blocked).
5.
If required, use the same procedure to test the 5
th
harmonic blocking feature.
10.3.2.7
Completing the test
GUID-FBE8F3A7-2ADE-4C60-9590-FC4B34D8AC56 v1
Continue to test another function or end the test by changing the
TestMode
setting
to
Off
. Restore connections and settings to their original values if they were
changed for testing purposes.
10.4
Impedance protection
SEMOD53525-1 v2
10.4.1
Automatic switch onto fault logic ZCVPSOF
M13850-2 v9
Prepare the IED for verification of settings outlined in Section
The automatic switch onto fault logic function ZCVPSOF is checked using
secondary injection tests. ZCVPSOF is activated either by the external input
BC
or
by the internal DLD. FUFSPVC is done with a pre-fault condition where the phase
voltages and currents are at zero. A reverse two-phase fault with zero impedance
and a two-phase fault with an impedance corresponding to the whole line is
applied. This fault shall cause an instantaneous trip and result in a
TRIP
indication.
10.4.1.1
Activating ZCVPSOF externally
M13850-14 v8
1.
Set
AutoInitMode
to
DLD disabled
and
Mode
to
Impedance
.
2.
Activate the switch onto fault
BC
input.
Section 10
1MRK 506 377-UEN C
Testing functionality by secondary injection
80
Railway application RER670 2.2 IEC
Commissioning manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Page 2: ......
Page 26: ...20...
Page 54: ...48...
Page 58: ...52...
Page 62: ...56...
Page 80: ...74...
Page 188: ...182...
Page 194: ...188...
Page 204: ...198...
Page 214: ...208...
Page 215: ...209...