Section 1
Section 2
A1A2_BS
B1B2_BS
ABC_LINE
ABC_BC
ABC_LINE
ABC_BC
(WA1)A1
(WA2)B1
(WA7)C
C
B2
A2
en04000489.vsd
AB_TRAFO
AB_TRAFO
IEC04000489 V1 EN-US
Figure 97:
Busbars divided by bus-section circuit breakers
To derive the signals:
Signal
BBTR_OP
No busbar transfer is in progress concerning this bus-section.
VP_BBTR
The switch status of BBTR is valid.
EXDU_12
No transmission error from any bay connected to busbar 1(A) and 2(B).
These signals from each line bay (ABC_LINE), each transformer bay
(AB_TRAFO), and bus-coupler bay (ABC_BC) are needed:
Signal
QB12OPTR
QB1 or QB2 or both are open.
VPQB12TR
The switch status of QB1 and QB2 are valid.
EXDU_12
No transmission error from the bay that contains the above information.
These signals from each bus-coupler bay (ABC_BC) are needed:
Signal
BC12OPTR
No bus-coupler connection through the own bus-coupler between busbar WA1 and
WA2.
VPBC12TR
The switch status of BC_12 is valid.
EXDU_BC
No transmission error from the bay that contains the above information.
These signals from the bus-section circuit breaker bay (A1A2_BS, B1B2_BS) are
needed.
Signal
S1S2OPTR
No bus-section coupler connection between bus-sections 1 and 2.
VPS1S2TR
The switch status of bus-section coupler BS is valid.
EXDU_BS
No transmission error from the bay that contains the above information.
For a bus-section circuit breaker between A1 and A2 section busbars, these
conditions are valid:
1MRK 506 375-UEN A
Section 12
Control
Railway application RER670 2.2 IEC
269
Application manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 22: ...16 ...
Page 48: ...42 ...
Page 70: ...64 ...
Page 80: ...74 ...
Page 100: ...94 ...
Page 210: ...204 ...
Page 364: ...358 ...
Page 384: ...378 ...
Page 468: ...462 ...
Page 494: ...488 ...
Page 504: ...498 ...
Page 505: ...499 ...