WA1 (A)
WA2 (B)
QB1
QC1
QA1
QC2
QC9
QB61
QB9
QB2
QC4
QA2
QC5
QC3
QB62
DB_BUS_B
DB_LINE
DB_BUS_A
en04000518.vsd
IEC04000518 V1 EN-US
Figure 121:
Switchyard layout double circuit breaker
M13584-4 v4
For a double circuit-breaker bay, the modules DB_BUS_A, DB_LINE and
DB_BUS_B must be used.
12.4.8.2
Configuration setting
M13584-6 v5
For application without QB9 and QC9, just set the appropriate inputs to open state
and disregard the outputs. In the functional block diagram, 0 and 1 are designated
0=FALSE and 1=TRUE:
•
QB9_OP = 1
•
QB9_CL = 0
•
QC9_OP = 1
•
QC9_CL = 0
If, in this case, line voltage supervision is added, then rather than setting QB9 to
open state, specify the state of the voltage supervision:
•
QB9_OP = VOLT_OFF
•
QB9_CL = VOLT_ON
If there is no voltage supervision, then set the corresponding inputs as follows:
•
VOLT_OFF = 1
•
VOLT_ON = 0
Section 12
1MRK 506 375-UEN A
Control
286
Railway application RER670 2.2 IEC
Application manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 22: ...16 ...
Page 48: ...42 ...
Page 70: ...64 ...
Page 80: ...74 ...
Page 100: ...94 ...
Page 210: ...204 ...
Page 364: ...358 ...
Page 384: ...378 ...
Page 468: ...462 ...
Page 494: ...488 ...
Page 504: ...498 ...
Page 505: ...499 ...