IL1
TRM_40.CH1(I)
UL1
TRM_40.CH7(U)
BOM_4.BO1
BOM_4.BO2
SMAI1
BLOCK
G1AI2P
O:1IT:3II:1
G1N
GRP1L1
G1AI1
GRP1L2
G1AI2
GRP1L1L2
G1AI3
GRP1N
G1AI4
SMAI2
O:1IT:3II:2
BLOCK
GRP2L1
GRP2L1L2
GRP2N
GRP2L2
G2AI2P
G2N
G2AI1
G2AI2
G2AI3
G2AI4
I2P
U2P
BLOCK
BLKZ
BLKZ1
BLKZ2
BLKZ3
TRIP
TRZ1
TRZ2
TRZ3
START
STZ1
STZ2
STZ3
O:920IT:3II:1
ZGTPDIS
Trip
Logic
IEC17000111-1-en.vsd
IEC17000111 V1 EN-US
Figure 21:
Typical configuration for single-phase railway supply system
In order to make IED work for single phase power system, the following steps to
be performed (see Figure
):
1. Connect IL1 current to the first and third inputs of the SMAI function block.
Set CT ratio for this analogue input accordingly (e.g. 300A/1A).
2. Connect UL1 voltage to the first and third inputs of the SMAI function block.
Set VT ratio for this analogue input accordingly (e.g. 25kV/100V).
When such configuration is made within ACT tool using only two available
analogue input signals (i.e. UL1 and IL1), the preprocessing block will perform the
following:
•
Quantities for the first phase (i.e. UL1 and IL1) will be directly measured from
the TRM
•
Quantities for the second phase (i.e. UL2 and IL2) will be forced to zero value
•
Phase-to-phase values (i.e. UL1L2 and IL1L2 ) will be directly measured from
the TRM but they will have identical values as quantities for the first phase
•
Positive sequence quantities (i.e. U1 and I1 ) will be forced to zero
unconditionally
•
Zero sequence quantities (i.e. 2Uo and 2Io ) will be forced to zero
unconditionally
Note that in such installations, distance or under-impedance protection can only use
L1-L2 measurement loop which will then effectively measure impedance Z=UL1/
IL1. The directional overcurrent protection can also be used. Directional and non-
directional earth fault overcurrent protections and residual overvoltage protection
shall not be used in such installations. All other backup protection and
measurement functions can be used.
1MRK 506 375-UEN A
Section 4
Analog inputs
Railway application RER670 2.2 IEC
63
Application manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 22: ...16 ...
Page 48: ...42 ...
Page 70: ...64 ...
Page 80: ...74 ...
Page 100: ...94 ...
Page 210: ...204 ...
Page 364: ...358 ...
Page 384: ...378 ...
Page 468: ...462 ...
Page 494: ...488 ...
Page 504: ...498 ...
Page 505: ...499 ...