12. Check that all trip and alarm contacts operate according to the configuration
logic.
13. Switch off the injection current and check from the service menu readings of
thermal status and LOCKOUT that the lockout resets at the set percentage of
heat content.
14. Activate the digital input for cooling input signal to switch over to base
current
IBase2
.
Wait 5 minutes to empty the thermal memory and set Time Constant 2 (
Tau2
)
in accordance with the setting plan.
15. Test with injection current 1.50 ·
IBase2
the thermal alarm level, the operate
time for tripping and the lockout reset in the same way as described for stage
IBase1
.
16. Finally check that start and trip information is stored in the event menu.
13.6.6.2
Completing the test
Continue to test another function or end the test by changing the
Test mode
setting
to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
13.6.7
Breaker failure protection CCRBRF
Prepare the IED for verification of settings as outlined in section
and
section
in this chapter.
The breaker failure protection function CCRBRF should normally be tested in
conjunction with some other function that provides a start signal. An external
START signal can also be used.
To verify the settings in the most common back-up trip mode
1 out of 3
, it is
sufficient to test phase-to-earth faults.
At mode
2 out of 4
the phase current setting,
IP>
can be checked by single-phase
injection where the return current is connected to the summated current input. The
value of residual (earth fault) current IN set lower than
IP>
is easiest checked in back-
up trip mode
1 out of 4
.
13.6.7.1
Checking the phase current operate value,
IP>
The check of the
IP>
current level is best made in
FunctionMode
=
Current
and
BuTripMode
=
1 out of 3
or
2 out of 4
.
1.
Apply the fault condition, including START of CCRBRF, with a current
below set
IP>
.
2.
Repeat the fault condition and increase the current in steps until a trip occurs.
3.
Compare the result with the set
IP>
.
4.
Disconnect AC and START input signals.
Section 13
1MRK 504 088-UEN C
Verifying settings by secondary injection
146
Installation and commissioning manual
Summary of Contents for RELION RET670
Page 1: ...Relion 670 series Transformer protection RET670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 82: ...76...
Page 88: ...82...
Page 94: ...88...
Page 104: ...98...
Page 110: ...104...
Page 210: ...204...
Page 230: ...224...
Page 239: ...233...