1.
Check that the IED settings are appropriate, especially the START value and
the definite time delay.
2.
Supply the IED with three-phase voltages at their rated values.
3.
Slowly decrease the frequency of the applied voltage, until the START signal
appears.
4.
Note the operate value and compare it with the set value.
5.
Increase the frequency until rated operating levels are reached.
6.
Check that the START signal resets.
7.
Instantaneously decrease the frequency of the applied voltage to a value about
20% lower than the operate value.
8.
Measure the time delay of the TRIP signal, and compare it with the set value.
Extended testing
1.
The test above can be repeated to check the time to reset.
2.
The tests above can be repeated to test the voltage dependent inverse time
characteristic.
Verification of the low voltage magnitude blocking
1.
Check that the IED settings are appropriate, especially the
StartFrequency
,
IntBlockLevel
, and the
TimeDlyOperate
.
2.
Supply the IED with three-phase voltages at rated values.
3.
Slowly decrease the magnitude of the applied voltage, until the BLKDMAGN
signal appears.
4.
Note the voltage magnitude value and compare it with the set value
IntBlockLevel
.
5.
Slowly decrease the frequency of the applied voltage, to a value below
StartFrequency
.
6.
Check that the START signal does not appear.
7.
Wait for a time corresponding to
TimeDlyOperate
, and make sure that the
TRIP signal not appears.
13.8.1.2
Completing the test
Continue to test another function or end the test by changing the
Test mode
setting
to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
13.8.2
Overfrequency protection SAPTOF
Prepare the IED for verification of settings as outlined in section
and
in this chapter.
13.8.2.1
Verifying the settings
1MRK 504 088-UEN C
Section 13
Verifying settings by secondary injection
165
Installation and commissioning manual
Summary of Contents for RELION RET670
Page 1: ...Relion 670 series Transformer protection RET670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 82: ...76...
Page 88: ...82...
Page 94: ...88...
Page 104: ...98...
Page 110: ...104...
Page 210: ...204...
Page 230: ...224...
Page 239: ...233...