![background image](http://html1.mh-extra.com/html/abb/relion-ret670/relion-ret670_installation-and-commissioning-manual_3414632092.webp)
IEC09000357-1-en.vsd
IEC09000357 V1 EN
Figure 47:
Select the TCP/IP protocol and open Properties
4. Select
Use the following IP address
and define
IP address
and
Subnet mask
,
. The IP address must be different from the IP address chosen for
the IED.
IEC09000658-1-en.vsd
IEC09000658 V1 EN
Figure 48:
Select: Use the following IP address
5. Use the
ping
command to verify connectivity with the IED.
6. Close all open windows and start PCM600.
Section 8
1MRK 504 088-UEN C
Set up the PCM600 communication link per IED
86
Installation and commissioning manual
Summary of Contents for RELION RET670
Page 1: ...Relion 670 series Transformer protection RET670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 82: ...76...
Page 88: ...82...
Page 94: ...88...
Page 104: ...98...
Page 110: ...104...
Page 210: ...204...
Page 230: ...224...
Page 239: ...233...