Secondary injection test circuitry for the voltage relay REU 513
When the test circuit has been completed and the switchgroups set, the auxiliary
voltage may be connected to the relay. The operation of the test circuit can be
verified with the aid of a multimeter.
2.1.
Testing of the matching transformers
Test each of the three transformer inputs separately. Apply a pure sinusoidal voltage
to the relay and compare the voltage value read from the relay via serial
communication with that shown by the voltmeter. The measurements can be made,
for instance, at the rated voltage of the relay. Note that the relay shows the measured
voltage as a multiple of the rated voltage U
n
used.
2.2.
Testing of the overvoltage stages
The test is carried out as a single-phase test. Before the test is started:
•
Record the actual SGR settings for later restoring.
•
Set the relay switchgroups as follows:
Setting values can be those actual used.
PC
4
4
x
4
4
4
x
4
x
3
3
3
x
3
3
3
2
2
2
2
2
2
2
x
1
x
1
1
1
1
1
1
TestU513
PO1
PO2
IRF
+ -
3U>
3U>>
1MKC950001-1
1
2
3
~
3U<
3U<<
5 6
3 4
13 14 15
1 2
17 18
5
6
7
8
10 11 12
7 8 9
SO1
SO2
X1.1
X2.1
I/O
L1
L2
L3
+ (~)
- (~)
S2
IRF
START
TRIP
START
TRIP
SGR1
SGR2
SGR3
SGR4
SGR5
SGR6
SGR7
SGR8
START
TRIP
START
TRIP
SGB1
SGB1
SGB1
SGB1
SGB1
SGB1
SGB1
BI
100 V
110 V
115 V
120 V
100 V
110 V
115 V
120 V
100 V
110 V
115 V
120 V
1 3 4 6 7 9
S1
L1
N
V
Optical
PC-interface
INDICATORS RESET
RELAYS & IND. RESET
MEMORIZED VALUES
RESET
Blocking of stage U<<
Blocking of stage U<
Blocking of stage U>>
Blocking of stage U>
TIMER START
TIMER STOP
Uaux
SGR
SGR1 = 4
SGR2 = 1
SGR3 = 8
SGR4 = 2
Setting
U> to SO1
t> to PO1
U>> to SO2
t>> to PO2